Governed deployment for ASIC fleets

Define a baseline, pilot group, success criteria and rollback path before expanding.

GOVERNED ROLLOUT

Do not scale an assumption. Scale an observed result

A fleet rollout is a controlled change process. Define the baseline, isolate a pilot group, agree thresholds, observe and keep rollback available.

  1. 01

    Baseline

    Current build, power, temperature, hashrate, errors and site constraints.

  2. 02

    Pilot cohort

    A limited representative group with recorded hardware context.

  3. 03

    Thresholds

    Go/no-go limits for stability, temperature, power and errors.

  4. 04

    Observation

    A defined period and comparable telemetry.

  5. 05

    Scale or rollback

    Evidence-backed expansion or a controlled return.

Build a fleet pilot brief

Qualification before configuration

Start with exact device count, model composition, control-board knowledge, current firmware family, primary operating goal and the site constraint that can stop the pilot.

Build the local qualification brief

Baseline packet

Inventory, exact model/control board/current build, settings, TH/s, wall power and W/TH, temperatures, errors, cooling/electrical conditions and measurement period.

Confirm the measurement worksheet with the corporate desk before the pilot

Compatibility waves

Group by model + control board + current build + target build + NAND method. Unmatched devices do not enter the same rollout wave.

Pilot cohort and decision gates

  1. 01

    Baseline

    Current build, power, temperature, hashrate, errors and site constraints.

  2. 02

    Pilot cohort

    A limited representative group with recorded hardware context.

  3. 03

    Thresholds

    Go/no-go limits for stability, temperature, power and errors.

  4. 04

    Observation

    A defined period and comparable telemetry.

  5. 05

    Scale or rollback

    Evidence-backed expansion or a controlled return.

Observation protocol

Baseline window → first boot check → early observation → agreed evaluation window. The minimum interval is agreed per device cohort before the pilot.

Scale or rollback

Record decision owner, rollout wave, change log and rollback trigger. No one-click or board-specific recovery claim is made.

CORPORATE DESK · LOCAL BRIEF

Prepare a pilot brief locally

Nothing is submitted here. The brief stays in this page until you copy it or open your email or Telegram client.

  1. 1 · Fleet scope
  2. 2 · Baseline and goal
  3. 3 · Pilot controls
  4. 4 · Contact and review
1 · Fleet scope
2 · Baseline and goal
3 · Pilot controls
4 · Contact and review

Next: compatibility and pilot-scope review

No SLA, automatic plan or economic result is promised. The local brief prepares the context for an email or Telegram handoff.

↑ Top